The SHINE PV 18-month milestone marks an important point in the project’s journey towards more sustainable, resource-efficient and cost-effective photovoltaic manufacturing in Europe. On 30 June 2026, SHINE PV completed the first 18 months of its activities, concluding the project’s first phase and setting the stage for the next steps.

In September, project partners gathered online for the M18 Consortium Meeting and the First Project Review Meeting. The meetings provided an opportunity to assess the achievements of the first 18 months, discuss the progress made across all work packages, and align on the next steps towards sustainable, high-throughput and industry-ready photovoltaic manufacturing technologies.

During these meetings, partners presented the progress achieved across the project, demonstrating strong collaboration and tangible advances towards reducing costs and increasing efficiency in European PV manufacturing.

Key achievements after 18 months

The SHINE PV 18-month milestone reflects significant progress across all seven work packages:

  • WP1 – Metallization: Innovative metallization approaches based on ultra-fine-line dispensing and plating technologies were developed for silicon heterojunction (SHJ) and TOPCon solar cells.
  • WP2 – Post-processing: Equipment was developed and optimized for production requirements covering both light-soaking and edge-passivation. Light-soaking processes delivered efficiency gains for both SHJ and TOPCon technologies, while edge-passivation approaches recovered a substantial share of performance losses.
  • WP3 – Interconnection and encapsulation: Shingling and Twill interconnection technologies were developed and scaled up, alongside novel encapsulation materials and strategies for thermomechanical modelling.
  • WP4 – Equipment development: Equipment development and validation activities were initiated to transfer project innovations from WP1–WP3. The first key units were designed, including metallization with parallel dispensing, modified light-soaking equipment, and a semi-automatic foil-making tool.
  • WP5 – Pilot line: The foundations of the SHINE PV pilot line were established by defining process flows, drafting pilot-line configurations, and starting the definition of modelling frameworks.
  • WP6 – Sustainability, impact and exploitation: Initial life-cycle, social and cost assessments were developed to strengthen the project’s impact. Planning for the exploitation strategy also began, alongside continued visibility through conference participation, publications, stakeholder engagement and an active online presence.
  • WP7 – Project management: Project Management and Coordination activities ensured the smooth implementation of project activities and effective collaboration among all consortium partners.

First Project Review Meeting

During the First Project Review Meeting with the CINEA Project Officer, the consortium presented the work completed during the first reporting period and received constructive feedback on both the project’s progress and its reporting activities.

The meetings demonstrated the consortium’s strong multidisciplinary expertise and collaborative spirit. They also confirmed that SHINE PV is making significant progress towards enabling more sustainable, resource-efficient and cost-effective photovoltaic manufacturing solutions for Europe.

Looking ahead after the SHINE PV 18-month milestone

Reaching the SHINE PV 18-month milestone represents an important achievement for the consortium. The progress made during the first phase provides a strong foundation for the next stage of the project, as partners continue developing and validating technologies with the potential to contribute to the future of European photovoltaic manufacturing.

AMIRES would like to thank all project partners for their continued commitment, active participation and valuable contributions throughout the first 18 months of SHINE PV.

We look forward to the next phase of the project and the exciting developments still to come!